A platform for research: civil engineering, architecture and urbanism
Construction Methods for producing the underground Sections of the new Unterinntal Route
Construction Methods for producing the underground Sections of the new Unterinntal Route
Construction Methods for producing the underground Sections of the new Unterinntal Route
Gangkofner, T. (author) / Keinprecht, M. (author) / Pellizzari, M. (author)
TUNNEL -GUTERSLOH- ; 20-28
2003-01-01
9 pages
Article (Journal)
English
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Planung und Bau der Unterinntal-Strecke zum Brenner Basistunnel
IuD Bahn | 2005
|Erfahrungen zur Baukoordination im Untertagebau im Unterinntal
Tema Archive | 2010
|Planung und Bau der Unterinntal-Strecke zum Brenner Basistunnel
British Library Online Contents | 2005
|