A platform for research: civil engineering, architecture and urbanism
Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 130 ; 616-625
2004-01-01
10 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
Online Contents | 2004
|Prototype Integrated Cost and Schedule Control System
British Library Online Contents | 1993
|Prototype Integrated Cost and Schedule Control System.
Online Contents | 1993
|Integrated cost and schedule control for construction projects
TIBKAT | 1986
|Project Numbering System for Integrated Cost and Schedule Control
British Library Conference Proceedings | 2001
|