A platform for research: civil engineering, architecture and urbanism
Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
Lee, E.-B. (author) / Harvey, J. T. (author) / Thomas, D. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 131 ; 1283-1291
2005-01-01
9 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Integrated Design-Construction-Operations Analysis for Fast-Track Urban Freeway Reconstruction
Online Contents | 2005
|Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction-Traffic Analysis
Online Contents | 2005
|Freeway spacing in urban freeway system
Engineering Index Backfile | 1960
|California's freeway design and construction
Engineering Index Backfile | 1947
|Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
British Library Online Contents | 2006
|