A platform for research: civil engineering, architecture and urbanism
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Lee, E.-B. (author) / Lee, H. (author) / Harvey, J. T. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 132 ; 465-472
2006-01-01
8 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Online Contents | 2006
|Analysis of the Impacts of Freeway Reconstruction Closures in Urban Areas
British Library Online Contents | 1999
|Analysis of the Impacts of Freeway Reconstruction Closures in Urban Areas
British Library Conference Proceedings | 1999
|Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
British Library Online Contents | 2005
|Integrated Design-Construction-Operations Analysis for Fast-Track Urban Freeway Reconstruction
Online Contents | 2005
|