A platform for research: civil engineering, architecture and urbanism
Factors contributing to the failure of asbestos cement water mains
Factors contributing to the failure of asbestos cement water mains
Factors contributing to the failure of asbestos cement water mains
Hu, Y. (author) / Hubble, D. W. (author)
CANADIAN JOURNAL OF CIVIL ENGINEERING ; 34 ; 608-621
2007-01-01
14 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Factors contributing to the failure of asbestos cement water mains
Online Contents | 2007
|Asbestos Cement Water Pressure Mains
Wiley | 1934
|FAILURE CONDITIONS OF ASBESTOS CEMENT WATER MAINS IN REGINA
British Library Conference Proceedings | 2005
|Asbestos-cement pipe for water mains and sewers
Engineering Index Backfile | 1941
|When Should I Replace My Asbestos Cement Water Mains?
British Library Conference Proceedings | 2014
|