A platform for research: civil engineering, architecture and urbanism
Border Bridge - 100m of bridge deck in 11 days
Kunst, I. (author)
CONCRETE -LONDON- CONCRETE SOCIETY- ; 42 ; 13-14
2008-01-01
2 pages
Article (Journal)
English
DDC:
693
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Border Bridge -- 100m of bridge deck in 11 days
Online Contents | 2008
|Study on load test of 100m cross-reinforced deck type concrete box arch bridge
DOAJ | 2018
|Prestressed precast bridge deck erected in eight days
Engineering Index Backfile | 1957
|Construction method of bridge deck slab, bridge deck slab and bridge
European Patent Office | 2022
|