A platform for research: civil engineering, architecture and urbanism
Prestressed precast bridge deck erected in eight days
Knight Road bridge near Philadelphia, consists of four identical spans of 72 ft 2 in. and two identical end spans of 45 ft 3 in.; bridge designed for standard H20-S16 loading; each span made up of eight hollow box girder beams 36 in. wide; beams are of pretensioned bonded design.
Prestressed precast bridge deck erected in eight days
Knight Road bridge near Philadelphia, consists of four identical spans of 72 ft 2 in. and two identical end spans of 45 ft 3 in.; bridge designed for standard H20-S16 loading; each span made up of eight hollow box girder beams 36 in. wide; beams are of pretensioned bonded design.
Prestressed precast bridge deck erected in eight days
Civ Eng (NY)
Long, J.B. (author)
Civil Engineering ; 27
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Half-through-type bridge with precast prestressed concrete deck
Engineering Index Backfile | 1953
Full-depth two-way precast prestressed concrete bridge deck system
British Library Conference Proceedings | 1998
|Eight floors erected in mine days
Engineering Index Backfile | 1930
|