A platform for research: civil engineering, architecture and urbanism
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Zhang, K.-B. (author) / Zhang, J.-R. (author) / Yan, D.-H. (author)
STRUCTURAL ENGINEERING INTERNATIONAL ; 18 ; 396-402
2008-01-01
7 pages
Article (Journal)
English
DDC:
624.1
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Online Contents | 2008
|Stability Research for CFST Tied Arch Bridge under Transverse Wind Load
British Library Conference Proceedings | 2009
|Tied-arch bridge arch rib support and tied-arch bridge arch rib installation method
European Patent Office | 2023
|Australia’s Arch Bridges and Its First CFST Arch Bridge
Springer Verlag | 2025
|Fabricated CFST arch bridge arch rib rapid construction method
European Patent Office | 2024
|