A platform for research: civil engineering, architecture and urbanism
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
Zhang, Ke-Bo (author) / Zhang, Jian-Ren / Yan, Dong-Huang
2008
Article (Journal)
German
BKL:
56.10
Ingenieurhochbau: Allgemeines
/
56.23
Brückenbau
Local classification TIB:
645/6510/6530
Model Test of Half-Through CFST Tied-Arch Bridge in the Process of Arch Rib Erection
British Library Online Contents | 2008
|Stability Research for CFST Tied Arch Bridge under Transverse Wind Load
British Library Conference Proceedings | 2009
|Tied-arch bridge arch rib support and tied-arch bridge arch rib installation method
European Patent Office | 2023
|Australia’s Arch Bridges and Its First CFST Arch Bridge
Springer Verlag | 2025
|Fabricated CFST arch bridge arch rib rapid construction method
European Patent Office | 2024
|