A platform for research: civil engineering, architecture and urbanism
Determining Air Demand for Small- to Medium-Sized Embankment Dam Low-Level Outlet Works
Determining Air Demand for Small- to Medium-Sized Embankment Dam Low-Level Outlet Works
Determining Air Demand for Small- to Medium-Sized Embankment Dam Low-Level Outlet Works
Tullis, B.P. (author) / Larchar, J. (author)
JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ; 137 ; 793-800
2011-01-01
8 pages
Article (Journal)
English
DDC:
627.52
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Determining Air Demand for Low-Level Outlet Works for Small and Medium Sized Dams
British Library Conference Proceedings | 2009
|British Library Online Contents | 2014
|Completion of Embankment, Spillway and Outlet Works
NTIS | 1990
|Granger Lake, Embankment-Outlet Works-Spillway. Volume 2
NTIS | 1983
|Cherry creek dam -- Embankment, outlet works rise fast
Engineering Index Backfile | 1948
|