A platform for research: civil engineering, architecture and urbanism
Temporary Works for the Direct Entrance Widening of Rosyth Dockyard
Temporary Works for the Direct Entrance Widening of Rosyth Dockyard
Temporary Works for the Direct Entrance Widening of Rosyth Dockyard
STRUCTURAL ENGINEER ; 90 ; 33-42
2012-01-01
10 pages
Article (Journal)
English
DDC:
624.1
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Engineering Index Backfile | 1926
|Entrance lock strengthening at Rosyth Royal Dockyard using rock anchorages
Online Contents | 1998
|Z Caisson at Rosyth Royal Dockyard
British Library Online Contents | 2000
|H. M. Dockyard, Devonport, widening of N.5 basin-entrance
Engineering Index Backfile | 1930
|H. M. Dockyard, Devonport. Widening of N. 5 basin-entrance
Engineering Index Backfile | 1929
|