Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Khanzadi, M. (author) / Nasirzadeh, F. (author) / Alipour, M. (author)
AUTOMATION IN CONSTRUCTION ; 22 ; 368-376
2012-01-01
9 pages
Article (Journal)
English