A platform for research: civil engineering, architecture and urbanism
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Khanzadi, Mostafa (author) / Nasirzadeh, Farnad / Alipour, Majid
2012
Article (Journal)
Unknown
BKL:
56.03
Methoden im Bauingenieurwesen
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
British Library Online Contents | 2012
|Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects
Online Contents | 2015
|