A platform for research: civil engineering, architecture and urbanism
Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Ji, S.-H. (author) / Park, M. (author) / Lee, H.-S. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 138 ; 43-52
2012-01-01
10 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Online Contents | 2012
|Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
British Library Online Contents | 2011
|Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Online Contents | 2011
|Improved similarity measure in case-based reasoning: a case study of construction cost estimation
Emerald Group Publishing | 2019
|