A platform for research: civil engineering, architecture and urbanism
Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling
Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling
Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling
Khamooshi, H. (author) / Cioffi, D.F. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 139 ; 488-497
2013-01-01
10 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Tunnel construction time and cost estimates: from deterministic to probabilistic approaches
BASE | 2013
|Probabilistic Optimal-Cost Scheduling
Online Contents | 2001
|Probabilistic Optimal-Cost Scheduling
British Library Online Contents | 2001
|