A platform for research: civil engineering, architecture and urbanism
Revisiting the Cycle Length: Lost Time Question with Critical Lane Analysis
Revisiting the Cycle Length: Lost Time Question with Critical Lane Analysis
Revisiting the Cycle Length: Lost Time Question with Critical Lane Analysis
Day, C.M. (author) / Sturdevant, J.R. (author) / Li, H. (author) / Stevens, A. (author) / Hainen, A.M. (author) / Remias, S.M. (author) / Bullock, D.M. (author)
2013-01-01
9 pages
Article (Journal)
English
DDC:
388
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Lost Time and Cycle Length for Actuated Traffic Signal
British Library Online Contents | 2009
|Cycle-Length Performance Measures: Revisiting and Extending Fundamentals
British Library Online Contents | 2009
|Model of Parallel-Type Acceleration Lane Length
ASCE | 2018
|Time Headway Analysis for Four-Lane and Two-Lane Roads
Springer Verlag | 2017
|