A platform for research: civil engineering, architecture and urbanism
Prediction of geological conditions for a tunnel boring machine using big operational data
Prediction of geological conditions for a tunnel boring machine using big operational data
Prediction of geological conditions for a tunnel boring machine using big operational data
Zhang, Qianli (author) / Liu, Zhenyu (author) / Tan, Jianrong (author)
Automation in construction ; 100 ; 73-83
2019-01-01
11 pages
Article (Journal)
English
DDC:
629.8
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prediction of geological conditions for a tunnel boring machine using big operational data
British Library Online Contents | 2019
|Taylor & Francis Verlag | 2023
|Using tunnel boring data to augment the geological model
British Library Online Contents | 2010
|Using tunnel boring data to augment the geological model
British Library Conference Proceedings | 2010
|Operational modelling of advance rates for tunnel boring machine
IuD Bahn | 2005
|