A platform for research: civil engineering, architecture and urbanism
Preliminary calibration of the 24-foot wind tunnel, R.A.E., with a short description of the tunnel
Preliminary calibration of the 24-foot wind tunnel, R.A.E., with a short description of the tunnel
Preliminary calibration of the 24-foot wind tunnel, R.A.E., with a short description of the tunnel
Jennings, W. G. (author) / Terry, A. (author) / Pearsall, P. J. (author)
1936
9 S., [2] Bl.
Ill., graph. Darst.
Digital preservation by Technische Informationsbibliothek (TIB) / Leibniz-Informationszentrum Technik und Naturwissenschaften und Universitätsbibliothek
Report
English
National Wind Tunnel Facility, IIT Kanpur-Calibration Aspects
British Library Conference Proceedings | 2000
|TUNNEL ELEPHANT FOOT REINFORCEMENT BEAM CONSTRUCTION METHOD FOR TUNNEL STABILIZING
European Patent Office | 2016
|Tunnel elephant foot reinforcement beam construction method for tunnel stabilizing
European Patent Office | 2016