A platform for research: civil engineering, architecture and urbanism
Economic Analysis of Leakage in the Bangkok Water Distribution System
Loss of water caused by leakage is a common phenomenon observed in all water distribution systems (WDSs). The volume of leakage around the world is considerably high, and its control is crucial to meet the increasing water demand caused by rapid population growth and urbanization. The most important component of a leakage-control strategy is target setting in terms of economic level of leakage (ELL). The ELL is an economic indication depending on individual network conditions, operating system pressures, demands and their patterns, marginal cost of water, and operating practices. This paper discusses the economic aspects of leakage for a pilot district metered area (DMA) of the WDS of the Metropolitan Waterworks Authority (MWA) in Bangkok, Thailand. The study developed two nomographs for the quick estimation of ELL and active leakage-control cost (ALC) with minimal data analysis. The first nomograph shows the relationship between cost of leakage control, average operating pressure, and level of leakage in the WDS. The second nomograph shows the relationship between ELL, operating-system pressure, and marginal cost of water. The nomographs have been developed based on leakage volume, cost of water, and hydraulic and operational conditions of the WDS. To model different hydraulic and leakage scenarios, the U.S. EPA’s EPANET simulation engine has been used. The research will help utility managers understand different aspects of leakage economics and will lead to better management of their WDSs.
Economic Analysis of Leakage in the Bangkok Water Distribution System
Loss of water caused by leakage is a common phenomenon observed in all water distribution systems (WDSs). The volume of leakage around the world is considerably high, and its control is crucial to meet the increasing water demand caused by rapid population growth and urbanization. The most important component of a leakage-control strategy is target setting in terms of economic level of leakage (ELL). The ELL is an economic indication depending on individual network conditions, operating system pressures, demands and their patterns, marginal cost of water, and operating practices. This paper discusses the economic aspects of leakage for a pilot district metered area (DMA) of the WDS of the Metropolitan Waterworks Authority (MWA) in Bangkok, Thailand. The study developed two nomographs for the quick estimation of ELL and active leakage-control cost (ALC) with minimal data analysis. The first nomograph shows the relationship between cost of leakage control, average operating pressure, and level of leakage in the WDS. The second nomograph shows the relationship between ELL, operating-system pressure, and marginal cost of water. The nomographs have been developed based on leakage volume, cost of water, and hydraulic and operational conditions of the WDS. To model different hydraulic and leakage scenarios, the U.S. EPA’s EPANET simulation engine has been used. The research will help utility managers understand different aspects of leakage economics and will lead to better management of their WDSs.
Economic Analysis of Leakage in the Bangkok Water Distribution System
Islam, M. Shafiqul (author) / Babel, Mukand Singh (author)
Journal of Water Resources Planning and Management ; 139 ; 209-216
2012-02-01
82013-01-01 pages
Article (Journal)
Electronic Resource
English
Economic Analysis of Leakage in the Bangkok Water Distribution System
British Library Online Contents | 2013
|Economic Analysis of Leakage in the Bangkok Water Distribution System
Online Contents | 2013
|Leakage management in a low-pressure water distribution network of Bangkok
Online Contents | 2009
|Tema Archive | 1996
|METROPOLITAN BANGKOK WATER PROJECT
Wiley | 1971
|