A platform for research: civil engineering, architecture and urbanism
In 2009, a possible dam deficiency was identified. Hyrum Dam was built over a relatively thin unconsolidated alluvial deposit that could be at risk for strength loss during a large earthquake. If large deformations were to occur because of the strength loss, the crest height might be reduced or cracking of the embankment may occur, and could potentially lead to failure. In order to assess the situation, a field investigation was completed to measure the in situ properties of the dam embankment and the alluvium; and a seismic hazard analysis was performed. A comprehensive analysis was then undertaken to estimate potential deformation and overtopping. Using the data from updated seismic loading, field investigation, and analysis, a risk analysis was performed for potential failure modes. The annualized failure probability was estimated, using an event tree approach. The risk analysis revealed that the likelihood of dam failure during a seismic event was below the Bureau of Reclamation’s (Reclamation) standards.
In 2009, a possible dam deficiency was identified. Hyrum Dam was built over a relatively thin unconsolidated alluvial deposit that could be at risk for strength loss during a large earthquake. If large deformations were to occur because of the strength loss, the crest height might be reduced or cracking of the embankment may occur, and could potentially lead to failure. In order to assess the situation, a field investigation was completed to measure the in situ properties of the dam embankment and the alluvium; and a seismic hazard analysis was performed. A comprehensive analysis was then undertaken to estimate potential deformation and overtopping. Using the data from updated seismic loading, field investigation, and analysis, a risk analysis was performed for potential failure modes. The annualized failure probability was estimated, using an event tree approach. The risk analysis revealed that the likelihood of dam failure during a seismic event was below the Bureau of Reclamation’s (Reclamation) standards.
Hyrum Dam’s Seismic Issue Evaluation
Eddy, Greg (author)
2016 Biennial Rocky Mountain Geo-Conference ; 2016 ; Golden, Colorado
Rocky Mountain Geo-Conference 2016 ; 166-189
2016-11-01
Conference paper
Electronic Resource
English
Fruitgrowers Dam’s Left Abutment Landslide Evaluation
ASCE | 2016
|Terminus dam's model excavation show
Engineering Index Backfile | 1960
Dornau dam's new spillway performs
Online Contents | 1997
Morning glory pares dam's cost
Engineering Index Backfile | 1968
Wanapum dam's ingenious construction
Engineering Index Backfile | 1961
|