Analysis of Temporary Traffic Control Cost Items in Transportation Construction Bidding Process
Temporary Traffic Control Plans (TCP's), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer's original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.
Analysis of Temporary Traffic Control Cost Items in Transportation Construction Bidding Process
Temporary Traffic Control Plans (TCP's), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer's original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.
Analysis of Temporary Traffic Control Cost Items in Transportation Construction Bidding Process
Agdas, Duzgun (author) / Ellis, Jr., Ralph D. (author)
Construction Research Congress 2010 ; 2010 ; Banff, Alberta, Canada
Construction Research Congress 2010 ; 1103-1114
2010-05-04
Conference paper
Electronic Resource
English
Analysis of Temporary Traffic Control Cost Items in Transportation Construction Bidding Process
British Library Conference Proceedings | 2010
|Machine Learning-Based Temporary Traffic Control Cost Analysis
TIBKAT | 2021
|Individual Cost Estimation in Construction Bidding Process Based on Cost Index
British Library Conference Proceedings | 2011
|Using Linked Building Data for managing temporary construction items
Elsevier | 2022
|