A platform for research: civil engineering, architecture and urbanism
Using Linked Building Data for managing temporary construction items
Abstract For decades, the construction industry has experienced poor productivity due to challenges such as increasing project complexity and a fragmented project environment. Even though some technological innovations around Building Information Modeling (BIM) might have the potential to overcome these challenges, data integration across disciplines, companies and software solutions is yet to be solved entirely. Trending advancements try to enrich existing BIM data using Linked Data technologies to semantically describe the building information and facilitate data integration. By that, project data from different data sources is made available in an accessible format, so project participants can use it for their planning efforts. In this paper we explore the use of Linked Building Data (LBD) on a specific use case to answer the question of how the planning of Temporary Construction Items (TCIs) can be improved by integrating data and automating the demand calculation. A literature review concludes that TCIs only experience little attention in the current planning of construction projects but have a critical impact on the outcome of a project. Thus, the objective of this paper is to develop standard ontologies to provide a semantically rich terminology of the data and to propose a framework for TCI consideration within a BIM based project delivery system. A prototype solution is developed, taking formwork as a TCI representative. The result is a process for automatically creating a TCI utilization plan that quantifies the precise time- and location-based on-site TCI demand by integrating data from BIM, Location-Based Scheduling (LBS) and TCI information. Based on the results of prototyping and findings from expert interviews, this research integrates the solution into the process of construction and finally proposes two implementation scenarios for the solution – one being based on the current industry situation and one exploring the future vision of a more integrated and decentralized project delivery in the construction industry.
Highlights Data integration is cruceial for improving construction productivity. Temporary Construction Items (TCIs) are lacking attention in construction planning. Integrating BIM and scheduling data enables to automate TCI planning. A rule-based algorithm can calculate the precise TCI demand with a time- and location-based TCI utilization plan, based on this data. A prototype solution is tested with a case project, upon which
Using Linked Building Data for managing temporary construction items
Abstract For decades, the construction industry has experienced poor productivity due to challenges such as increasing project complexity and a fragmented project environment. Even though some technological innovations around Building Information Modeling (BIM) might have the potential to overcome these challenges, data integration across disciplines, companies and software solutions is yet to be solved entirely. Trending advancements try to enrich existing BIM data using Linked Data technologies to semantically describe the building information and facilitate data integration. By that, project data from different data sources is made available in an accessible format, so project participants can use it for their planning efforts. In this paper we explore the use of Linked Building Data (LBD) on a specific use case to answer the question of how the planning of Temporary Construction Items (TCIs) can be improved by integrating data and automating the demand calculation. A literature review concludes that TCIs only experience little attention in the current planning of construction projects but have a critical impact on the outcome of a project. Thus, the objective of this paper is to develop standard ontologies to provide a semantically rich terminology of the data and to propose a framework for TCI consideration within a BIM based project delivery system. A prototype solution is developed, taking formwork as a TCI representative. The result is a process for automatically creating a TCI utilization plan that quantifies the precise time- and location-based on-site TCI demand by integrating data from BIM, Location-Based Scheduling (LBS) and TCI information. Based on the results of prototyping and findings from expert interviews, this research integrates the solution into the process of construction and finally proposes two implementation scenarios for the solution – one being based on the current industry situation and one exploring the future vision of a more integrated and decentralized project delivery in the construction industry.
Highlights Data integration is cruceial for improving construction productivity. Temporary Construction Items (TCIs) are lacking attention in construction planning. Integrating BIM and scheduling data enables to automate TCI planning. A rule-based algorithm can calculate the precise TCI demand with a time- and location-based TCI utilization plan, based on this data. A prototype solution is tested with a case project, upon which
Using Linked Building Data for managing temporary construction items
Schlachter, Alexander (author) / Rasmussen, Mads Holten (author) / Karlshøj, Jan (author)
2022-04-06
Article (Journal)
Electronic Resource
English
A linked building data approach to site planning and managing temporary construction items
TIBKAT | 2021
|TEMPORARY BUILDING CONSTRUCTION METHOD USING CONTAINER BOX
European Patent Office | 2015
|