Toe Wall Analysis, Design, Installation, and Trouble Shooting at the Port of Hueneme
To accommodate increasing vessel sizes and improve current throughput, the Port of Hueneme (Port) increased depth at Wharf 1, Berths 1 and 2 while maintaining the current seismic performance of the wharf and slope by installing a submerged retaining wall at the toe of the slope (toe wall). The installation of the toe wall required removing and rebuilding the fender system. The Port took this opportunity to also double the capacity of mooring fixtures and repair the concrete infrastructure, achieving two berths ready to accommodate larger vessels from a depth, berthing, and mooring perspective. This paper will describe the challenges of designing the toe wall, fendering, mooring fixtures, and miscellaneous repairs. It will also highlight the installation challenges that were overcome during the construction such as unique techniques discovered for the installation of composite fender piles in granular soils and dealing with significant sheet pile obstructions.
Toe Wall Analysis, Design, Installation, and Trouble Shooting at the Port of Hueneme
To accommodate increasing vessel sizes and improve current throughput, the Port of Hueneme (Port) increased depth at Wharf 1, Berths 1 and 2 while maintaining the current seismic performance of the wharf and slope by installing a submerged retaining wall at the toe of the slope (toe wall). The installation of the toe wall required removing and rebuilding the fender system. The Port took this opportunity to also double the capacity of mooring fixtures and repair the concrete infrastructure, achieving two berths ready to accommodate larger vessels from a depth, berthing, and mooring perspective. This paper will describe the challenges of designing the toe wall, fendering, mooring fixtures, and miscellaneous repairs. It will also highlight the installation challenges that were overcome during the construction such as unique techniques discovered for the installation of composite fender piles in granular soils and dealing with significant sheet pile obstructions.
Toe Wall Analysis, Design, Installation, and Trouble Shooting at the Port of Hueneme
Bergman, Adam W. (author) / Story, Sean M. (author) / Graham, Todd (author) / Birdsey, Christina (author)
16th Triennial International Conference ; 2022 ; Honolulu, Hawaii
Ports 2022 ; 648-658
2022-09-15
Conference paper
Electronic Resource
English
CECOS: 50 years of training at Port Hueneme
British Library Online Contents | 1996
|Port Hueneme Harbor, Ventura County, California
NTIS | 1972
Littoral bypassing and beach restoration in vicinity of Port Hueneme California
Engineering Index Backfile | 1966
|A Unique Partnership for Contaminated Sediment Management: The Port of Hueneme Experience
Online Contents | 2009
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
British Library Conference Proceedings | 2006
|