The materials available and the methods selected to build a rolled-fill embankment dam in north-central British Columbia are described. The specification requirements for the dam materials are given. A limited working season and a tight construction schedule dictated high volume fill placing. The contractor selected a 15,000 ft single-flight high-speed conveyor to move 57,500,000 cu yd of soil from a glacial moraine to a processing plant. Forty-eight percent of the material was processed and reblended to form selected zone materials in a $10,000 plant built in 9 months. The handling system includes high-speed belts and automatic staged disc brakes. The system has been effective and reliable, and the project is ahead of schedule after initial delays.
The materials available and the methods selected to build a rolled-fill embankment dam in north-central British Columbia are described. The specification requirements for the dam materials are given. A limited working season and a tight construction schedule dictated high volume fill placing. The contractor selected a 15,000 ft single-flight high-speed conveyor to move 57,500,000 cu yd of soil from a glacial moraine to a processing plant. Forty-eight percent of the material was processed and reblended to form selected zone materials in a $10,000 plant built in 9 months. The handling system includes high-speed belts and automatic staged disc brakes. The system has been effective and reliable, and the project is ahead of schedule after initial delays.
Portage Mountain Dam Conveyor System
Low, W. Irvine (author)
Journal of the Construction Division ; 93 ; 33-51
2021-01-01
191967-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Portage mountain conveyor system
Engineering Index Backfile | 1966
|Portage mountain dam conveyor system
Engineering Index Backfile | 1967
|Discussion of “Portage Mountain Dam Conveyor System”
ASCE | 2021
|Closure to “Portage Mountain Dam Conveyor System”
ASCE | 2021
|4-mile conveyor moves moraine to build portage mountain dam
Engineering Index Backfile | 1964