A platform for research: civil engineering, architecture and urbanism
4-mile conveyor moves moraine to build portage mountain dam
Design features and construction methods of rockfill dam now under construction for British Columbia Hydro and Power Authority are described; dam rises 600 ft from bedrock of Peace River and measures 6700 ft long at crest; its volume is 60 million cu yd; operation of 15,000-ft long plant-feed conveyor that travels 13 mph and delivers 12,000 tons of material per hour on its 66-in. wide, steel-reinforced rubber belt is also described.
4-mile conveyor moves moraine to build portage mountain dam
Design features and construction methods of rockfill dam now under construction for British Columbia Hydro and Power Authority are described; dam rises 600 ft from bedrock of Peace River and measures 6700 ft long at crest; its volume is 60 million cu yd; operation of 15,000-ft long plant-feed conveyor that travels 13 mph and delivers 12,000 tons of material per hour on its 66-in. wide, steel-reinforced rubber belt is also described.
4-mile conveyor moves moraine to build portage mountain dam
Eng News -- Rec
Engineering News-Record ; 173
1964
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Portage mountain conveyor system
Engineering Index Backfile | 1966
|Portage mountain dam conveyor system
Engineering Index Backfile | 1967
|Portage Mountain Dam Conveyor System
ASCE | 2021
|Discussion of “Portage Mountain Dam Conveyor System”
ASCE | 2021
|Closure to “Portage Mountain Dam Conveyor System”
ASCE | 2021
|