A platform for research: civil engineering, architecture and urbanism
Erection of Hydraulic Turbines and Generators
Most engineers who have installed hydroelectric generators have discovered that certain units operate perfectly whereas others perform in a manner leaving much to be desired. Construction methods and procedures differ widely, and the writer believes that, by adhering to certain fundamentals in erection procedure, most units can be assembled so as to operate perfectly. The purpose of this paper is to offer suggestions for the perfection of such methods and procedures.
Erection of Hydraulic Turbines and Generators
Most engineers who have installed hydroelectric generators have discovered that certain units operate perfectly whereas others perform in a manner leaving much to be desired. Construction methods and procedures differ widely, and the writer believes that, by adhering to certain fundamentals in erection procedure, most units can be assembled so as to operate perfectly. The purpose of this paper is to offer suggestions for the perfection of such methods and procedures.
Erection of Hydraulic Turbines and Generators
Komora, Andrew M. (author)
Transactions of the American Society of Civil Engineers ; 110 ; 581-592
2021-01-01
121945-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Erection of hydraulic turbines and generators
Engineering Index Backfile | 1945
|Erection of hydraulic turbines and generators
Engineering Index Backfile | 1944
|The erection of two large steam turbines
Engineering Index Backfile | 1906
|Discussion of “Gisigeh on Erection of Turbines”
ASCE | 2021
|Closure to “Komora on Erection of Turbines”
ASCE | 2021
|