A platform for research: civil engineering, architecture and urbanism
This paper describes in detail the interesting methods used in the excavation of the Moffat Tunnel in Colorado. This work is really two parallel headings constructed at the same time, one a single-track railroad tunnel and the other a pressure tunnel for water. There is also included a brief statement of the location and purpose for which the tunnels are built, as well as some notes on the financing of the work by the Moffat Tunnel Commission representing the Moffat Tunnel Improvement District, the form of contract for the construction, and the workmen's bonus plan.
This paper describes in detail the interesting methods used in the excavation of the Moffat Tunnel in Colorado. This work is really two parallel headings constructed at the same time, one a single-track railroad tunnel and the other a pressure tunnel for water. There is also included a brief statement of the location and purpose for which the tunnels are built, as well as some notes on the financing of the work by the Moffat Tunnel Commission representing the Moffat Tunnel Improvement District, the form of contract for the construction, and the workmen's bonus plan.
Construction Methods on the Moffat Tunnel
Keays, R. H. (author)
Transactions of the American Society of Civil Engineers ; 92 ; 63-109
2021-01-01
471928-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Construction methods on the Moffat tunnel
Engineering Index Backfile | 1927
|Construction methods on six-mile Moffat tunnel
Engineering Index Backfile | 1925
Construction of the Moffat tunnel
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1927