A platform for research: civil engineering, architecture and urbanism
Construction methods on six-mile Moffat tunnel
Parallel tunnel with cross drifts to main tunnel takes care of haulage and other services; squeezing rock called for unusual timbering methods.
Construction methods on six-mile Moffat tunnel
Parallel tunnel with cross drifts to main tunnel takes care of haulage and other services; squeezing rock called for unusual timbering methods.
Construction methods on six-mile Moffat tunnel
Eng. News-Rec
1925
6 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Moffat six-mile tunnel, Colorado
Engineering Index Backfile | 1927
Fighting rail corrosion in 6.21-mile Moffat tunnel
Engineering Index Backfile | 1938
|Six-mile Moffat tunnel through the Rocky Mountains
Engineering Index Backfile | 1923
Fighting rail corrosion in 6.21-mile Moffat tunnel
Engineering Index Backfile | 1938
|Construction Methods on the Moffat Tunnel
ASCE | 2021
|