Determining how to quickly design and construct three separate concrete bridges, each 1 km long or more, to link Abū aby’s (Abu Dhabi’s) new Khalifa Port Industrial Zone to two newly developed islands dedicated to port operations required a concerted effort on the part of engineers, contractors, and fabricators and resulted in three similar crossings that make the best use of both precast and cast-in-place elements. Design ingenuity, state-of-the-art precast-concrete technologies, and carefully coordinated marine operations ensured the expeditious erection of the bridges.
Combined Effort
Determining how to quickly design and construct three separate concrete bridges, each 1 km long or more, to link Abū aby’s (Abu Dhabi’s) new Khalifa Port Industrial Zone to two newly developed islands dedicated to port operations required a concerted effort on the part of engineers, contractors, and fabricators and resulted in three similar crossings that make the best use of both precast and cast-in-place elements. Design ingenuity, state-of-the-art precast-concrete technologies, and carefully coordinated marine operations ensured the expeditious erection of the bridges.
Combined Effort
Karapiperis, Dennis (author) / Lykidis, Georgios (author) / Savvopoulos, Georgios C. (author) / Sayed, Khaled El (author) / Loukakis, Kostas (author)
Civil Engineering Magazine Archive ; 80 ; 74-85
2016-01-01
122010-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Online Contents | 2010
|ASCE | 2016
|DRILLING WELLS IN MADAGASCAR: An Achievement of Combined Effort
Oxford University Press | 1970
|ASCE | 2016
|Online Contents | 1995
|