Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined Effort
Determining how to quickly design and construct three separate concrete bridges, each 1 km long or more, to link Abū aby’s (Abu Dhabi’s) new Khalifa Port Industrial Zone to two newly developed islands dedicated to port operations required a concerted effort on the part of engineers, contractors, and fabricators and resulted in three similar crossings that make the best use of both precast and cast-in-place elements. Design ingenuity, state-of-the-art precast-concrete technologies, and carefully coordinated marine operations ensured the expeditious erection of the bridges.
Combined Effort
Determining how to quickly design and construct three separate concrete bridges, each 1 km long or more, to link Abū aby’s (Abu Dhabi’s) new Khalifa Port Industrial Zone to two newly developed islands dedicated to port operations required a concerted effort on the part of engineers, contractors, and fabricators and resulted in three similar crossings that make the best use of both precast and cast-in-place elements. Design ingenuity, state-of-the-art precast-concrete technologies, and carefully coordinated marine operations ensured the expeditious erection of the bridges.
Combined Effort
Karapiperis, Dennis (Autor:in) / Lykidis, Georgios (Autor:in) / Savvopoulos, Georgios C. (Autor:in) / Sayed, Khaled El (Autor:in) / Loukakis, Kostas (Autor:in)
Civil Engineering Magazine Archive ; 80 ; 74-85
01.01.2016
122010-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Online Contents | 2010
|ASCE | 2016
|DRILLING WELLS IN MADAGASCAR: An Achievement of Combined Effort
Oxford University Press | 1970
|ASCE | 2016
|Online Contents | 1995
|