A platform for research: civil engineering, architecture and urbanism
Continued planning is under way by the Corps of Engineers for development of the water resources of the Columbia River Basin. These studies will take cognizance of changed conditions and needs since the Corps' comprehensive report of 1948. This paper outlines these changes and the problems being encountered in providing an extended long-range plan for resource development.
Continued planning is under way by the Corps of Engineers for development of the water resources of the Columbia River Basin. These studies will take cognizance of changed conditions and needs since the Corps' comprehensive report of 1948. This paper outlines these changes and the problems being encountered in providing an extended long-range plan for resource development.
The Columbia River Controlled
Foote, Louis H. (author)
Transactions of the American Society of Civil Engineers ; 125 ; 583-597
2021-01-01
151960-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1891
Engineering Index Backfile | 1932
|Columbia River improvement uneconomical
Engineering Index Backfile | 1935
|Columbia river suspension bridge
Engineering Index Backfile | 1919
|