A platform for research: civil engineering, architecture and urbanism
Accelerating Flood Relief
To expedite flood relief in two neighborhoods, the District of Columbia Water and Sewer Authority accelerated the design and construction of the approximately 2,700 ft long First Street Tunnel, which can store up to 9 million gallons of stormwater and wastewater that otherwise would overwhelm the city's combined sewer system. To be completed this month, construction of the tunnel and its appurtenant facilities included ground freezing in several locations to minimize untoward effects on the dense urban neighborhood above.
Accelerating Flood Relief
To expedite flood relief in two neighborhoods, the District of Columbia Water and Sewer Authority accelerated the design and construction of the approximately 2,700 ft long First Street Tunnel, which can store up to 9 million gallons of stormwater and wastewater that otherwise would overwhelm the city's combined sewer system. To be completed this month, construction of the tunnel and its appurtenant facilities included ground freezing in several locations to minimize untoward effects on the dense urban neighborhood above.
Accelerating Flood Relief
Jain, Ravi (author) / Hee, Ivan (author) / Njoloma, Stephen (author) / Levy, William (author) / Shinouda, Mina (author)
Civil Engineering Magazine Archive ; 86 ; 66-84
2017-01-01
192016-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Habbaniyah flood relief scheme
Engineering Index Backfile | 1946
Flood-Prone Subdivision Gets Relief
Online Contents | 1993
|Flood relief tunnel under Bristol
British Library Online Contents | 2009
Flood Control - Flood alleviation brings relief and regeneration to Glasgow
Online Contents | 2011
Arroyo Vega flood relief tunnel design
Wiley | 2023
|