Remedial Foundation Grouting of Dworshak Dam
This paper discusses the foundation remedial grouting program on the left abutment of the Dworshak Dam. Since 1972, the time of the initial reservoir filling, seepage flows under the left abutment have increased steadily. With increasing flows, micaceous material emitted from the downstream flumes of the left abutment indicated that fill material was being eroded from bedrock fractures. Upon concluding several studies of the seepage problem, the U.S. Army Corps of Engineers determined that remedial grouting was necessary to reestablish the foundation grout curtain beneath the affected monoliths.
Remedial Foundation Grouting of Dworshak Dam
This paper discusses the foundation remedial grouting program on the left abutment of the Dworshak Dam. Since 1972, the time of the initial reservoir filling, seepage flows under the left abutment have increased steadily. With increasing flows, micaceous material emitted from the downstream flumes of the left abutment indicated that fill material was being eroded from bedrock fractures. Upon concluding several studies of the seepage problem, the U.S. Army Corps of Engineers determined that remedial grouting was necessary to reestablish the foundation grout curtain beneath the affected monoliths.
Remedial Foundation Grouting of Dworshak Dam
Hall, Ron F. (author) / Krumm, Paul (author)
Waterpower Conference 1999 ; 1999 ; Las Vegas, Nevada, United States
Waterpower '99 ; 1-6
1999-07-05
Conference paper
Electronic Resource
English
Remedial Grouting of Dworshak Dam
British Library Conference Proceedings | 1998
|Dworshak Dam Foundation Grouting
British Library Conference Proceedings | 1998
|Construction Stresses in Dworshak Dam
NTIS | 1965
|Engineering Index Backfile | 1967
|Polymer-Impregnated Concrete at Dworshak Dam
ASCE | 2021
|