A platform for research: civil engineering, architecture and urbanism
Experience of Pipe Jacking Tunneling in Gravel Formation
Gravel formation is the most common formation in Taichung area in Taiwan, where most of the gravels are hard and having high strength having strong interlock between gravels. Methods used for underground constructions in gravel formation are still under exploration due to lack of experience. Thus, the objective of this study is to focus on investigation of Taichung base waste water outflow pipeline construction using pipe jacking method. The analyzed data during tunnel construction include attrition and repair of the machine, torque applied at the cutter face, thrust forces used to push the pipes, encountered problems, and tunnel advancing rate are synthesized and analyzed. For drive distance less than 90 m, the thrust forces used to push the pipes are around 400 to 500 tons. The frictional resistance between the pipe, the outside diameter is 2.85m, and ground is around 0.6 to 1.0 ton/m2. The average advancing rate, time used to push each pipe and torque applied at the cutter head are 20.6 mm/min, 2.9 hours and 260 t-m, respectively.
Experience of Pipe Jacking Tunneling in Gravel Formation
Gravel formation is the most common formation in Taichung area in Taiwan, where most of the gravels are hard and having high strength having strong interlock between gravels. Methods used for underground constructions in gravel formation are still under exploration due to lack of experience. Thus, the objective of this study is to focus on investigation of Taichung base waste water outflow pipeline construction using pipe jacking method. The analyzed data during tunnel construction include attrition and repair of the machine, torque applied at the cutter face, thrust forces used to push the pipes, encountered problems, and tunnel advancing rate are synthesized and analyzed. For drive distance less than 90 m, the thrust forces used to push the pipes are around 400 to 500 tons. The frictional resistance between the pipe, the outside diameter is 2.85m, and ground is around 0.6 to 1.0 ton/m2. The average advancing rate, time used to push each pipe and torque applied at the cutter head are 20.6 mm/min, 2.9 hours and 260 t-m, respectively.
Experience of Pipe Jacking Tunneling in Gravel Formation
Hsu, Sung-Chi (author) / Tsai, Pei-Hsun (author) / Wang, Chih-Sheng (author) / Lin, Ji-Yuan (author)
GeoHunan International Conference 2011 ; 2011 ; Hunan, China
2011-05-16
Conference paper
Electronic Resource
English
Pipes , Taiwan , Geomaterials , Case studies , Gravel , Jacking , Pavements , Tunnels , Tunneling
Experience of Pipe Jacking Tunneling in Gravel Formation
British Library Conference Proceedings | 2011
|Geotechnical Investigations for Tunneling & Pipe Jacking
British Library Conference Proceedings | 1998
|Jacking or tunneling for placing culvert pipe
Engineering Index Backfile | 1928
Soil improving method for rectangular-pipe jacking construction in gravel soil layer
European Patent Office | 2015
|Pipe jacking device and pipe jacking construction process
European Patent Office | 2020
|