Design, Pipe Material Selection, and Manufacture for the Lake Texoma Outfall Raw Water Pipeline: Genesis of a Fast-Paced Large-Diameter Project
The North Texas Municipal Water District (NTMWD) is responsible for supplying raw water to its 13 member cities ultimately benefitting nearly 2 million people. Water from Lake Texoma, located on the Texas-Oklahoma border, accounts for approximately one quarter of NTMWD's supply. Restrictions were placed on pumping water out of the Lake due to an infestation of zebra mussels in 2009 and a major state-wide drought in 2010 and 2011, resulting in NTMWD facing severe shortages to it water supply. In 2011, an initiative was undertaken to have a new large-diameter transmission pipeline built that would bring the zebra mussel-infested water directly from Lake Texoma into a treatment facility in Wylie, Texas. The resulting design was that of a 50-mile transmission pipeline ranging in diameter from 84 in. to 96 in. that needed to meet demands in the summer of 2014. This line had to be built in just over two years, with an aggressive fast-paced design and construction schedule. Failure to successfully meet this schedule-driven project would result in severe impacts to more than a million people. The construction manager at risk (CMAR) delivery method for materials and construction procurement was used, along with other nonconventional methods such as direct communication with multiple pipe procurement during design and release of pipe manufacturer bid packages with only 30% design plans. This paper discusses in detail the means and methods utilized in delivering this large-scale project in the fastest and most efficient manner, design and specification of the pipeline, and pipe material selection from the CMAR engineer's perspective. This is followed by details of the submittal and pipe-making processes from a manufacturer's perspective on three of the five sections of the pipeline.
Design, Pipe Material Selection, and Manufacture for the Lake Texoma Outfall Raw Water Pipeline: Genesis of a Fast-Paced Large-Diameter Project
The North Texas Municipal Water District (NTMWD) is responsible for supplying raw water to its 13 member cities ultimately benefitting nearly 2 million people. Water from Lake Texoma, located on the Texas-Oklahoma border, accounts for approximately one quarter of NTMWD's supply. Restrictions were placed on pumping water out of the Lake due to an infestation of zebra mussels in 2009 and a major state-wide drought in 2010 and 2011, resulting in NTMWD facing severe shortages to it water supply. In 2011, an initiative was undertaken to have a new large-diameter transmission pipeline built that would bring the zebra mussel-infested water directly from Lake Texoma into a treatment facility in Wylie, Texas. The resulting design was that of a 50-mile transmission pipeline ranging in diameter from 84 in. to 96 in. that needed to meet demands in the summer of 2014. This line had to be built in just over two years, with an aggressive fast-paced design and construction schedule. Failure to successfully meet this schedule-driven project would result in severe impacts to more than a million people. The construction manager at risk (CMAR) delivery method for materials and construction procurement was used, along with other nonconventional methods such as direct communication with multiple pipe procurement during design and release of pipe manufacturer bid packages with only 30% design plans. This paper discusses in detail the means and methods utilized in delivering this large-scale project in the fastest and most efficient manner, design and specification of the pipeline, and pipe material selection from the CMAR engineer's perspective. This is followed by details of the submittal and pipe-making processes from a manufacturer's perspective on three of the five sections of the pipeline.
Design, Pipe Material Selection, and Manufacture for the Lake Texoma Outfall Raw Water Pipeline: Genesis of a Fast-Paced Large-Diameter Project
Maughn, Scott (author) / Rahman, Shah (author) / Nawal, Manish (author) / Sechelski, Mike (author) / Ast, William (author)
Pipelines 2014 ; 2014 ; Portland, Oregon
Pipelines 2014 ; 310-319
2014-07-30
Conference paper
Electronic Resource
English
Total, dissolved, and bioavailable metals at Lake Texoma marinas
Online Contents | 2003
|Groundwater quality surrounding Lake Texoma during short-term drought conditions
Online Contents | 2003
|Water quality at five marinas in Lake Texoma as related to methyl tert-butyl ether (MTBE)
Online Contents | 2002
|Outfall Pipeline Stabilization in the Surf Zone
British Library Conference Proceedings | 1993
|Placing 10-ft, diam. outfall pipe
Engineering Index Backfile | 1965