A platform for research: civil engineering, architecture and urbanism
The Distribution of Stresses in Mitering Loc-Gates, with Special Reference to the Gates on the Panama Canal (A Discussion)
While engaged on the Panama Canal work, in 1907-08, as designing engineer of the emergency dams, at the same time that the author was similarly engaged on the design of lock gates, this paper was practically prepared, and little 'of any consequence happened with which the writer was not conversant. ' It is surprising, therefore, that the paper should appear at this late date, especially when the method was published -previously in the United States ·Deep Waterways' report ·of 1900.
The Distribution of Stresses in Mitering Loc-Gates, with Special Reference to the Gates on the Panama Canal (A Discussion)
While engaged on the Panama Canal work, in 1907-08, as designing engineer of the emergency dams, at the same time that the author was similarly engaged on the design of lock gates, this paper was practically prepared, and little 'of any consequence happened with which the writer was not conversant. ' It is surprising, therefore, that the paper should appear at this late date, especially when the method was published -previously in the United States ·Deep Waterways' report ·of 1900.
The Distribution of Stresses in Mitering Loc-Gates, with Special Reference to the Gates on the Panama Canal (A Discussion)
Molitor, David A. (author)
Transactions of the American Society of Civil Engineers ; 82 ; 1469-1472
2021-01-01
41918-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Engineering Index Backfile | 1918
Building Panama canal lock gates
Engineering Index Backfile | 1911
Construction details of the Panama canal lock gates
Engineering Index Backfile | 1914
|Discussion on Canal Head-Gates
ASCE | 2021
|