A platform for research: civil engineering, architecture and urbanism
Perencanaan Panen Air Hujan Sebagai Sumber Air Bersih Alternatif Di Kampus STIK Bina Husada Palembang
Rainfall harvest planning is planned as an alternative clean water source on theSTIK Bina Husada Palembang campus. Planning for building rainwaterharvesting in the form of tanks and other buildings that are suitable to the needs.Planning for rainwater harvesting on this campus will be calculated according tothe needs of clean water and the amount of rainwater that can be harvested everyrainy event every month. The calculation results of water requirements on theBina Husada STIK campus, especially the Grand building and Graha building in2018 are 315 m3 / month for average needs, 8.2 m3 for daily maximumrequirements and 2.5 m3 / hour for water requirements during peak hours. Everyyear PDAM water usage for the Grand building and Graha building requires 3,790m3 of water or the equivalent of Rp 31.7 million in tariff payments. The rainharvesting system used is an underground tank building and the rest of the rainthat is not collected is directly discharged into the sewer and then to the waterbody. The use of gutters in a rain reservoir measuring 15x20 cm, on the roof sideused splash guards and metal sheets with a width of 30 cm installed every 3 m,and used pipes with a diameter of 100 mm. For now rainwater that can beaccommodated is 6.8 m3 per rainy day, 25 percent of the total potential ofrainwater that exists.
Perencanaan Panen Air Hujan Sebagai Sumber Air Bersih Alternatif Di Kampus STIK Bina Husada Palembang
Rainfall harvest planning is planned as an alternative clean water source on theSTIK Bina Husada Palembang campus. Planning for building rainwaterharvesting in the form of tanks and other buildings that are suitable to the needs.Planning for rainwater harvesting on this campus will be calculated according tothe needs of clean water and the amount of rainwater that can be harvested everyrainy event every month. The calculation results of water requirements on theBina Husada STIK campus, especially the Grand building and Graha building in2018 are 315 m3 / month for average needs, 8.2 m3 for daily maximumrequirements and 2.5 m3 / hour for water requirements during peak hours. Everyyear PDAM water usage for the Grand building and Graha building requires 3,790m3 of water or the equivalent of Rp 31.7 million in tariff payments. The rainharvesting system used is an underground tank building and the rest of the rainthat is not collected is directly discharged into the sewer and then to the waterbody. The use of gutters in a rain reservoir measuring 15x20 cm, on the roof sideused splash guards and metal sheets with a width of 30 cm installed every 3 m,and used pipes with a diameter of 100 mm. For now rainwater that can beaccommodated is 6.8 m3 per rainy day, 25 percent of the total potential ofrainwater that exists.
Perencanaan Panen Air Hujan Sebagai Sumber Air Bersih Alternatif Di Kampus STIK Bina Husada Palembang
Rahim, Supli Effendi (author) / Damiri, Nurhayati (author) / Zaman, Chairil (author) / Husin, Husin (author) / Anggraini, Dian Eka (author) / Harokan, Ali (author) / Muntaha, Amar (author)
2019-07-14
Seminar Nasional Hari Air Sedunia; Vol 2, No 1 (2019): Hari Air Dunia 2019; 133-144 ; 2621-7449
Article (Journal)
Electronic Resource
English
DDC:
720
Pemanenan Air Hujan Sebagai Alternatif Pemenuhan Akses Air Baku Air Bersih di Kabupaten Trenggalek
DOAJ | 2023
|PERENCANAAN KINCIR ANGIN SAVONIUS U TIGA SUDU SEBAGAI SUMBER ENERGI ALTERNATIF
BASE | 2015
|Desalinasi Air Laut Berbasis Energi Surya Sebagai Alternatif Penyediaan Air Bersih
DOAJ | 2018
|