Degrees of freedom in road construction
One policy that is believed to increase the rate of innovation and the level of productivity is to move from Design-bid-build contracts (DBB) to Design-Build contracts (DB). A common view is that the latter provides the contractor more degrees of freedom to enable innovation. This hypothesis consists of two steps, first that DB actually has more degrees of freedom and secondly that more degrees of freedom leads to more innovation. This paper focuses on the first step and is based on a review of five road construction projects – two labelled DBB and three DB. It is demonstrated that there is a gap between the textbook definition of the two types of contracts and the actual design of the examples. The degrees of freedom for the contractor are restricted in both DB and DBB contracting and no significant difference in this dimension could be established. Based on this lack of difference in the five projects, the expectation of innovation for the labelled contracts cannot be settled. Some possible rational reasons for the client to restrict the degrees of freedom are also suggested.
Degrees of freedom in road construction
One policy that is believed to increase the rate of innovation and the level of productivity is to move from Design-bid-build contracts (DBB) to Design-Build contracts (DB). A common view is that the latter provides the contractor more degrees of freedom to enable innovation. This hypothesis consists of two steps, first that DB actually has more degrees of freedom and secondly that more degrees of freedom leads to more innovation. This paper focuses on the first step and is based on a review of five road construction projects – two labelled DBB and three DB. It is demonstrated that there is a gap between the textbook definition of the two types of contracts and the actual design of the examples. The degrees of freedom for the contractor are restricted in both DB and DBB contracting and no significant difference in this dimension could be established. Based on this lack of difference in the five projects, the expectation of innovation for the labelled contracts cannot be settled. Some possible rational reasons for the client to restrict the degrees of freedom are also suggested.
Degrees of freedom in road construction
Nyström, Johan (author) / Lind, Hans (author) / Nilsson, Jan-Eric (author)
2014-01-01
Paper
Electronic Resource
English
DDC:
690
Degrees of freedom and innovations in construction contracts
Online Contents | 2016
|Degrees of freedom and innovations in construction contracts
Elsevier | 2016
|IET Digital Library Archive | 1998
Road profile measurement using the two degrees of freedom response-type mechanism
Tema Archive | 2015
|System with many degrees of freedom
Tema Archive | 2013
|