A platform for research: civil engineering, architecture and urbanism
Perencanaan Pembangkit Listrik Tenaga Surya Solar Home System
New and renewable energy sources in the future will increasingly have a very important role in meeting energy needs. In 2020, in Lampung province there are still areas that have not yet had electricity, one of which is Rawajitu Timur Subdistrict, Tulang Bawang Regency, where the community uses a Diesel Power Plant which is used by the crowd as lighting at night. So to get a more efficient source of electricity and utilize solar energy as a new and renewable energy, it is necessary to design a solar power plant, the Solar Home System (SHS). The methodology in this design is to create and test tools based on needs with 50 Wp SHS power. Making starts from the design and assembly followed by testing with variable changes in light intensity. Retrieval of data from this design as much as 4 times with the best results, namely 44.27 watts with a voltage of 14.5 volts and a current of 3.26 amperes during sunny weather with a measured light intensity of 1.293lumens. The energy source used by SHS is obtained free of charge and is available in largequantities
Perencanaan Pembangkit Listrik Tenaga Surya Solar Home System
New and renewable energy sources in the future will increasingly have a very important role in meeting energy needs. In 2020, in Lampung province there are still areas that have not yet had electricity, one of which is Rawajitu Timur Subdistrict, Tulang Bawang Regency, where the community uses a Diesel Power Plant which is used by the crowd as lighting at night. So to get a more efficient source of electricity and utilize solar energy as a new and renewable energy, it is necessary to design a solar power plant, the Solar Home System (SHS). The methodology in this design is to create and test tools based on needs with 50 Wp SHS power. Making starts from the design and assembly followed by testing with variable changes in light intensity. Retrieval of data from this design as much as 4 times with the best results, namely 44.27 watts with a voltage of 14.5 volts and a current of 3.26 amperes during sunny weather with a measured light intensity of 1.293lumens. The energy source used by SHS is obtained free of charge and is available in largequantities
Perencanaan Pembangkit Listrik Tenaga Surya Solar Home System
Afrida, Yenni (author) / Fitriono, Fitriono (author) / Setiabudi, Bayu (author)
2021-05-29
doi:10.36269/jtr.v2i1.400
Jurnal Ilmiah Teknik Elektro; Vol 2, No 1: (Mei, 2021); 23-27 ; 2746-1750
Article (Journal)
Electronic Resource
English
DDC:
690
Perencanaan Pembangkit Listrik Tenaga Surya Skala Industri Berbasis PVsyst
DOAJ | 2023
|Studi Perencanaan dan Monitoring System Pembangkit Listrik Tenaga Surya di Remote Area
DOAJ | 2021
|Perencanaan Dan Analisis Ekonomi Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Untuk Desa Mandiri
BASE | 2019
|Analisis Teknis Dan Ekonomi Pembangkit Listrik Tenaga Surya Atap Berbasis PVsyst
DOAJ | 2024
|Potensi Pembangkit Listrik Tenaga Surya Atap Gedung Sekolah di Kota Denpasar
BASE | 2019
|