A platform for research: civil engineering, architecture and urbanism
Closing the gap towards super-long suspension bridges using computational morphogenesis
Girder design for suspension bridges has remained largely unchanged for the past 60 years. However, for future super-long bridges, aiming at record-breaking spans beyond 3 km, the girder weight is a limiting factor. Here we report on a design concept, inspired by computational morphogenesis procedures, demonstrating possible weight savings in excess of 28 percent while maintaining manufacturability. Although morphogenesis procedures are rarely used in civil engineering, often due to complicated designs, we demonstrate that even a crude extraction of the main features of the optimized design, followed by a simple parametric optimization, results in hitherto unseen weight reductions. We expect that further studies of the proposed design, as well as applications to other structures, will lead to even greater weight savings and reductions in carbon footprint in a construction industry, currently responsible for 39 percent of the world's CO2 emissions.
Closing the gap towards super-long suspension bridges using computational morphogenesis
Girder design for suspension bridges has remained largely unchanged for the past 60 years. However, for future super-long bridges, aiming at record-breaking spans beyond 3 km, the girder weight is a limiting factor. Here we report on a design concept, inspired by computational morphogenesis procedures, demonstrating possible weight savings in excess of 28 percent while maintaining manufacturability. Although morphogenesis procedures are rarely used in civil engineering, often due to complicated designs, we demonstrate that even a crude extraction of the main features of the optimized design, followed by a simple parametric optimization, results in hitherto unseen weight reductions. We expect that further studies of the proposed design, as well as applications to other structures, will lead to even greater weight savings and reductions in carbon footprint in a construction industry, currently responsible for 39 percent of the world's CO2 emissions.
Closing the gap towards super-long suspension bridges using computational morphogenesis
Baandrup, Mads Jacob (author) / Sigmund, Ole (author) / Polk, Henrik (author) / Aage, Niels (author)
2020-01-01
Baandrup , M J , Sigmund , O , Polk , H & Aage , N 2020 , ' Closing the gap towards super-long suspension bridges using computational morphogenesis ' , Nature Communications , vol. 11 , no. 1 , 2735 . https://doi.org/10.1038/s41467-020-16599-6
Article (Journal)
Electronic Resource
English
Super Long Suspension Bridges: Railway Runnability
British Library Conference Proceedings | 1996
|Technology for super-long suspension bridges
Tema Archive | 2005
|Aerodynamic Stabilisation for Super Long-Span Suspension Bridges
British Library Conference Proceedings | 1998
|Aerodynamic/structural improvement against flutter instability of super long suspension bridges
British Library Conference Proceedings | 1994
|