A platform for research: civil engineering, architecture and urbanism
Team 6: SRT collaborative platform for maturity assessment
Procurement, Construction, Facility Management and Second Life are the four steps, post design, that each building undergoes one on at least once in its lifespan. In an ideal situation, the four life cycle stages work symbiotically together to strive towards best possible regenerative performance. In practice, however, the driving factors of the involved actors are manifold and mostly driven by financial matters, which poses a challenge of implementing a lean process that integrates all actors. Showing interconnections, which actions of one contributor have to others in the project, represents a key element that requires rethinking within the industry. In order to tackle the characterised intricacies, the Cost RESTORE WG 3 Training School focused on designing a tool dedicated to enabling regenerative construction and operation. More than just promoting sustainability, the tool should help actors at all building stages to foster regenerative aspects. Following a holistic approach, regenerative construction projects can be brought closer to a circular life cycle.
Team 6: SRT collaborative platform for maturity assessment
Procurement, Construction, Facility Management and Second Life are the four steps, post design, that each building undergoes one on at least once in its lifespan. In an ideal situation, the four life cycle stages work symbiotically together to strive towards best possible regenerative performance. In practice, however, the driving factors of the involved actors are manifold and mostly driven by financial matters, which poses a challenge of implementing a lean process that integrates all actors. Showing interconnections, which actions of one contributor have to others in the project, represents a key element that requires rethinking within the industry. In order to tackle the characterised intricacies, the Cost RESTORE WG 3 Training School focused on designing a tool dedicated to enabling regenerative construction and operation. More than just promoting sustainability, the tool should help actors at all building stages to foster regenerative aspects. Following a holistic approach, regenerative construction projects can be brought closer to a circular life cycle.
Team 6: SRT collaborative platform for maturity assessment
Elena Gualandi (author) / Aranzazu Galan Gonzalez (author) / Nevena Simic (author) / Manuel de Borja Torrejon (author) / Peretti Giulia / Druhmann Carsten K. / Gualandi, Elena / Galan Gonzalez, Aranzazu / Simic, Nevena / de Borja Torrejon, Manuel
2019-01-01
Article/Chapter (Book)
Electronic Resource
English
DDC:
690
BIM maturity assessment and certification in construction project team selection
BASE | 2015
|PLATFORM - Dutch MBR grows to maturity
Online Contents | 2005
|Intelligent virtual team in collaborative design
IEEE | 2006
|Collaborative Design: Team Cognition and Communication
Springer Verlag | 2020
|The gold standard: developing a maturity model to assess collaborative scheduling
Emerald Group Publishing | 2022
|