A platform for research: civil engineering, architecture and urbanism
Optimal Operation and Management of Smart Grid System with LPC and BESS in Fault Conditions
Distributed generators (DG) using renewable energy sources (RESs) have been attracting special attention within distribution systems. However, a large amount of DG penetration causes voltage deviation and reverse power flow in the smart grid. Therefore, the smart grid needs a solution for voltage control, power flow control and power outage prevention. This paper proposes a decision technique of optimal reference scheduling for a battery energy storage system (BESS), inverters interfacing with a DG and voltage control devices for optimal operation. Moreover, the reconfiguration of the distribution system is made possible by the installation of a loop power flow controller (LPC). Two separate simulations are provided to maintain the reliability in the stable power supply and economical aspects. First, the effectiveness of the smart grid with installed BESS or LPC devices is demonstrated in fault situations. Second, the active smart grid using LCPs is proposed. Real-time techniques of the dual scheduling algorithm are applied to the system. The aforementioned control objective is formulated and solved using the particle swarm optimization (PSO) algorithm with an adaptive inertia weight (AIW) function. The effectiveness of the optimal operation in ordinal and fault situations is verified by numerical simulations.
Optimal Operation and Management of Smart Grid System with LPC and BESS in Fault Conditions
Distributed generators (DG) using renewable energy sources (RESs) have been attracting special attention within distribution systems. However, a large amount of DG penetration causes voltage deviation and reverse power flow in the smart grid. Therefore, the smart grid needs a solution for voltage control, power flow control and power outage prevention. This paper proposes a decision technique of optimal reference scheduling for a battery energy storage system (BESS), inverters interfacing with a DG and voltage control devices for optimal operation. Moreover, the reconfiguration of the distribution system is made possible by the installation of a loop power flow controller (LPC). Two separate simulations are provided to maintain the reliability in the stable power supply and economical aspects. First, the effectiveness of the smart grid with installed BESS or LPC devices is demonstrated in fault situations. Second, the active smart grid using LCPs is proposed. Real-time techniques of the dual scheduling algorithm are applied to the system. The aforementioned control objective is formulated and solved using the particle swarm optimization (PSO) algorithm with an adaptive inertia weight (AIW) function. The effectiveness of the optimal operation in ordinal and fault situations is verified by numerical simulations.
Optimal Operation and Management of Smart Grid System with LPC and BESS in Fault Conditions
Ryuto Shigenobu (author) / Ahmad Samim Noorzad (author) / Cirio Muarapaz (author) / Atsushi Yona (author) / Tomonobu Senjyu (author)
2016
Article (Journal)
Electronic Resource
Unknown
voltage control , distributed generator , battery energy storage system , reverse power flow , loop power flow controller , fault analysis , renewable energy source , active smart grid , adaptive inertia weight particle swarm optimization , Environmental effects of industries and plants , TD194-195 , Renewable energy sources , TJ807-830 , Environmental sciences , GE1-350
Metadata by DOAJ is licensed under CC BY-SA 1.0
Power Management in Grid Isolated Hybrid Power System Incorporating RERs and BESS
BASE | 2018
|Exploiting OLTC and BESS Operation Coordinated with Active Network Management in LV Networks
DOAJ | 2020
|The optimal home energy management strategy in smart grid
American Institute of Physics | 2016
|Improvement of PV grid-tied inverters operation under asymmetrical fault conditions
British Library Online Contents | 2016
|