A platform for research: civil engineering, architecture and urbanism
New Configuration and Novel Reclosing Procedure of Distribution System for Utilization of BESS as UPS in Smart Grid
This paper proposes a new configuration and novel reclosing procedure of a distribution system with a battery energy storage system (BESS) used as an uninterruptible power supply (UPS) in a smart grid. The proposed new configurations of the distribution systems are the installation of a circuit breaker (CB) on both sides of the distribution line, the replacement of the recloser with a CB and protective relay, and the requirement of a communication method. The proposed reclosing procedure performs the reclosing of the CB at the load side and then judges the fault clearance using the load current. If the fault is cleared, the synchronism checking between the main source and the BESS is performed. After completing this, the CB at the main source side is reclosed. The smart grid environment, including a new distribution system, BESS, and reclosing method are modeled with the Electromagnetic Transients Program (EMTP)/ATPDraw. To verify the proposed method, the various simulations according to the fault clearance time are performed and analyzed. The simulation results show that the BESS can be operated as a UPS and successful reclosing is possible.
New Configuration and Novel Reclosing Procedure of Distribution System for Utilization of BESS as UPS in Smart Grid
This paper proposes a new configuration and novel reclosing procedure of a distribution system with a battery energy storage system (BESS) used as an uninterruptible power supply (UPS) in a smart grid. The proposed new configurations of the distribution systems are the installation of a circuit breaker (CB) on both sides of the distribution line, the replacement of the recloser with a CB and protective relay, and the requirement of a communication method. The proposed reclosing procedure performs the reclosing of the CB at the load side and then judges the fault clearance using the load current. If the fault is cleared, the synchronism checking between the main source and the BESS is performed. After completing this, the CB at the main source side is reclosed. The smart grid environment, including a new distribution system, BESS, and reclosing method are modeled with the Electromagnetic Transients Program (EMTP)/ATPDraw. To verify the proposed method, the various simulations according to the fault clearance time are performed and analyzed. The simulation results show that the BESS can be operated as a UPS and successful reclosing is possible.
New Configuration and Novel Reclosing Procedure of Distribution System for Utilization of BESS as UPS in Smart Grid
Hun-Chul Seo (author)
2017
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Reclosing scheme using synchronism checking for utilization of BESS in distribution system
DOAJ | 2017
|Optimal Operation and Management of Smart Grid System with LPC and BESS in Fault Conditions
DOAJ | 2016
|Power Management in Grid Isolated Hybrid Power System Incorporating RERs and BESS
BASE | 2018
|