Planning of construction projects taking into account the design risk
Complex construction projects require appropriate planning that allows for time and cost optimization, maximization of the use of available resources and appropriate investment control. Scheduling is a complicated process, due to the uncertainties and risks associated with construction works, the paper describes the development of the scheduling method traditionally used in Poland, based on data from KNR catalogs, by using the RiskyProject Professional program. In the RiskyProject Professional program, the risk and uncertainty with reference to a specific construction project were modeled, and the calculation results were compared with the real time of the project implementation. The conclusions from the work carried out confirm that the SRA (Schedule Risk Analysis) analysis of the base schedule allows for a more faithful representation of the actual conditions of a construction project. The probability of investment realization generated on the basis of the SRA analysis may be assumed at the level of 75÷90%.
Planning of construction projects taking into account the design risk
Complex construction projects require appropriate planning that allows for time and cost optimization, maximization of the use of available resources and appropriate investment control. Scheduling is a complicated process, due to the uncertainties and risks associated with construction works, the paper describes the development of the scheduling method traditionally used in Poland, based on data from KNR catalogs, by using the RiskyProject Professional program. In the RiskyProject Professional program, the risk and uncertainty with reference to a specific construction project were modeled, and the calculation results were compared with the real time of the project implementation. The conclusions from the work carried out confirm that the SRA (Schedule Risk Analysis) analysis of the base schedule allows for a more faithful representation of the actual conditions of a construction project. The probability of investment realization generated on the basis of the SRA analysis may be assumed at the level of 75÷90%.
Planning of construction projects taking into account the design risk
Paulina Kostrzewa-Demczuk (author) / Magdalena Rogalska (author)
2023
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Taking into account environmental values in building construction
British Library Conference Proceedings | 1998
|Taking resident aspirations into account
Online Contents | 2008
|Sustainable construction taking into account the building impact on the environment
BASE | 2010
|