A platform for research: civil engineering, architecture and urbanism
Application of Comprehensive Rectification Method in Rectification of Buildings
This year, there are two ways to rectify buildings: forced landing and jacking up. The method of landing is to increase the settlement of the smaller side of the building, and the method of landing is the digging soil method, the irrigation method, the pile loading method, etc. the jacking method is on the basis of the stable foundation settlement, and the upper structure or foundation is raised on the larger side of the building so that the building will be leveled back, and the jacking method has static pressure pile top. Lifting method, lime pile lifting method, high pressure jet pile jacking method, etc. But in practice, a kind of rectification method cannot meet the purpose of building rectification. It needs two or more rectification methods to achieve the goal. This method of simultaneous application of two or more rectification methods on the same building is called the comprehensive rectification method. In this paper, some common rectifying methods are introduced. At the same time, the application of the comprehensive rectification method in engineering is explained in the background of practical engineerings.
Application of Comprehensive Rectification Method in Rectification of Buildings
This year, there are two ways to rectify buildings: forced landing and jacking up. The method of landing is to increase the settlement of the smaller side of the building, and the method of landing is the digging soil method, the irrigation method, the pile loading method, etc. the jacking method is on the basis of the stable foundation settlement, and the upper structure or foundation is raised on the larger side of the building so that the building will be leveled back, and the jacking method has static pressure pile top. Lifting method, lime pile lifting method, high pressure jet pile jacking method, etc. But in practice, a kind of rectification method cannot meet the purpose of building rectification. It needs two or more rectification methods to achieve the goal. This method of simultaneous application of two or more rectification methods on the same building is called the comprehensive rectification method. In this paper, some common rectifying methods are introduced. At the same time, the application of the comprehensive rectification method in engineering is explained in the background of practical engineerings.
Application of Comprehensive Rectification Method in Rectification of Buildings
Yang Xiaoyi (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Analysis on Deviation Rectification and Reinforcement of Buildings
Trans Tech Publications | 2011
|Wiley | 2020
|Restoration, rectification and recycling of buildings and structures
British Library Conference Proceedings | 1990
|Analysis on Deviation Rectification and Reinforcement of Buildings
British Library Conference Proceedings | 2011
|