A platform for research: civil engineering, architecture and urbanism
Arrangement of construction joints in cast-in-place slabs
Within latest decades cast-in-place construction of residential houses has been actively developed. Works on erection of cast-in-place frame of the building are normally performed by phases, which results in a necessity to arrange construction joints of concreting. In accordance with regulatory documents, it is allowed to arrange construction joints in any place of the slab, in parallel with its less side. As well, it is necessary to observe the technology for joint arrangement. As practice shows, observing only technology of construction joint arrangement is insufficient to provide for strength properties of cast-in-place reinforced-concrete slabs. This article provides an analysis of actual geodetic pre-construction surveys, design and theoretically-calculated solutions; case study is a multistoried building under construction. On which basis, excessive slab deflections in the places of construction joints, were detected. It is established, that the main reason for deflection occurrence is early removal of slab formwork and installation of supports for temporary supporting. On the basis of obtained findings authors make conclusions regarding compulsory observance of the technology for construction joint arrangement, regarding a necessity to remove formwork according to common standards 70.13330.2012; as well, it is recommended to leave formwork under construction joints until concrete gains 100% of ruggedness.
Arrangement of construction joints in cast-in-place slabs
Within latest decades cast-in-place construction of residential houses has been actively developed. Works on erection of cast-in-place frame of the building are normally performed by phases, which results in a necessity to arrange construction joints of concreting. In accordance with regulatory documents, it is allowed to arrange construction joints in any place of the slab, in parallel with its less side. As well, it is necessary to observe the technology for joint arrangement. As practice shows, observing only technology of construction joint arrangement is insufficient to provide for strength properties of cast-in-place reinforced-concrete slabs. This article provides an analysis of actual geodetic pre-construction surveys, design and theoretically-calculated solutions; case study is a multistoried building under construction. On which basis, excessive slab deflections in the places of construction joints, were detected. It is established, that the main reason for deflection occurrence is early removal of slab formwork and installation of supports for temporary supporting. On the basis of obtained findings authors make conclusions regarding compulsory observance of the technology for construction joint arrangement, regarding a necessity to remove formwork according to common standards 70.13330.2012; as well, it is recommended to leave formwork under construction joints until concrete gains 100% of ruggedness.
Arrangement of construction joints in cast-in-place slabs
Yakovleva Irina (author) / Kurochkina Valentina (author)
2019
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Fabricated frame structure and construction method of superimposed cast-in-place slabs
European Patent Office | 2021
|CONSTRUCTION TECHNIQUES FOR CRACK CONTROL OF CAST-IN-PLACE CONCRETE SLABS AND WALLS
TIBKAT | 2022
|Crack Control Measures for Cast-in-Place Concrete Slabs
British Library Conference Proceedings | 2015
|Horizontal shear connections between precast beams and cast-in-place slabs
Engineering Index Backfile | 1964
|