A platform for research: civil engineering, architecture and urbanism
Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures successful high-rise modular project completion. For improved efficiency, the lifting plan should minimize the reaching distance of the tower crane, because this distance directly affects the tower crane capacity, which is directly related to crane operation cost. In situations where units are lifted from trailers, the trailer-to-tower crane distance can have a significant impact on the tower crane operation efficiency. However, optimization of this distance to improve efficiency has not been sufficiently considered. This research proposes a genetic algorithm optimization model that suggests optimized tower crane and trailer locations. The case study results show that through the proposed model, the project manager can reflect the optimal location selection and optimal tower crane selection options with minimal cost.
Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures successful high-rise modular project completion. For improved efficiency, the lifting plan should minimize the reaching distance of the tower crane, because this distance directly affects the tower crane capacity, which is directly related to crane operation cost. In situations where units are lifted from trailers, the trailer-to-tower crane distance can have a significant impact on the tower crane operation efficiency. However, optimization of this distance to improve efficiency has not been sufficiently considered. This research proposes a genetic algorithm optimization model that suggests optimized tower crane and trailer locations. The case study results show that through the proposed model, the project manager can reflect the optimal location selection and optimal tower crane selection options with minimal cost.
Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
Hosang Hyun (author) / Moonseo Park (author) / Dowan Lee (author) / Jeonghoon Lee (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Critical considerations on tower crane layout planning for high-rise modular integrated construction
Emerald Group Publishing | 2021
|Concrete plate lifting device for construction crane tower
European Patent Office | 2020
|Location Optimization of Tower Cranes on High-Rise Modular Housing Projects
DOAJ | 2023
|