A platform for research: civil engineering, architecture and urbanism
Construction of Vibro-Pile in Machine-electric Equipment Warehouse in Jinghong Hydropower Station
Construction of Vibro-Pile in Machine-electric Equipment Warehouse in Jinghong Hydropower Station
Construction of Vibro-Pile in Machine-electric Equipment Warehouse in Jinghong Hydropower Station
JI Hong-ke (author) / ZHANG Shi-yong (author)
2010
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Study on the Properties of Roller Compacted Concrete in the Dam of Jinghong Hydropower Station
Trans Tech Publications | 2011
|Vibrating pile, vibro-replacement stone crushing equipment and vibro-replacement construction method
European Patent Office | 2024
|Vibro-replacement pile forming method of vibro-replacement gravel pile machine
European Patent Office | 2023
|Pile body forming method in vibro-replacement stone pile machine construction
European Patent Office | 2023
|