A platform for research: civil engineering, architecture and urbanism
The Prefabricated Construction Project’s Problems and Countermeasures of Construction Site Management
In comparison of the traditional building system, prefabricated building can reflect the development trend of building industrialization. Prefabricated building speeds up the construction by manufactured high-quality and high-precision components in the factory; then assembling the components to the construction site. Which can meet the requirements of green building without the need of cast-inplace and assembly. However, the application of prefabricated building also has limitations: prefabricated building is still lack of perfect relevant standards and component atlas; compared with the traditional pouring building, the mechanical and seismic performance of prefabricated building is poor. In the aspect of factory manufacturing, there are some problems. For example, because the form of prefabricated components is monotonous, it is difficult to meet the diverse appearance requirements of buildings. At present, the improvement of prefabricated building mainly focuses on the production and construction technology of components, but it lacks the improvement of the project management.
The Prefabricated Construction Project’s Problems and Countermeasures of Construction Site Management
In comparison of the traditional building system, prefabricated building can reflect the development trend of building industrialization. Prefabricated building speeds up the construction by manufactured high-quality and high-precision components in the factory; then assembling the components to the construction site. Which can meet the requirements of green building without the need of cast-inplace and assembly. However, the application of prefabricated building also has limitations: prefabricated building is still lack of perfect relevant standards and component atlas; compared with the traditional pouring building, the mechanical and seismic performance of prefabricated building is poor. In the aspect of factory manufacturing, there are some problems. For example, because the form of prefabricated components is monotonous, it is difficult to meet the diverse appearance requirements of buildings. At present, the improvement of prefabricated building mainly focuses on the production and construction technology of components, but it lacks the improvement of the project management.
The Prefabricated Construction Project’s Problems and Countermeasures of Construction Site Management
Man Sanlong (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Uncertainty analysis in construction project's appraisal phase
British Library Conference Proceedings | 2007
|Problems and Effective Countermeasures in Construction Safety Management
British Library Conference Proceedings | 2013
|Problems and Effective Countermeasures in Construction Safety Management
Tema Archive | 2013
|An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)
DOAJ | 2021
|