A platform for research: civil engineering, architecture and urbanism
Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, serta Biaya Rework pada Mesin Stabil
This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the unavailability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance.
Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, serta Biaya Rework pada Mesin Stabil
This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the unavailability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance.
Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, serta Biaya Rework pada Mesin Stabil
Zahedi Zahedi (author)
2014
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Estimasi Biaya Konseptual Pada Jembatan Beton Bertulang Dengan Metode Indek Biaya
BASE | 2017
|ANALISIS EVALUASI BIAYA DAN PENJADWALAN WAKTU PROYEK PENGOLAHAN LIMBAH PT. KI DENGAN PENDEKATAN PERT
BASE | 2017
|